LGH Case Studies

Every LGH case study tells a story of innovation and determination. From sliding a 536T steel bridge section into place, to replacing a hydroelectric turbine generator, to delicately positioning priceless works of art, we thrive on a challenge.

Ready to be inspired? Explore our case studies and see how LGH can elevate your next project to new heights! Your success story starts here.

🇺🇸 USA Case Study: Air-Cooled Chiller Install With Double CMOD Setup

Overcoming Tight Headroom Restrictions: Air-Cooled Chiller Install With Double CMOD Setup LGH was called upon to provide equipment for a...

Read More

🇺🇸 USA Case Study: Mechanical Adjustments Crucial in CMOD Install of Air Handlers at Salk Hall

Talk About a Tight Fit: Mechanical Adjustments Crucial in CMOD Install of Air Handlers at Salk Hall   LGH recently...

Read More

🇺🇸 USA Case Study: How Moving 170,000 lbs Went Off Without a Hitch

  How Moving 170,000 lbs Went Off Without a Hitch We love it when a plan comes together! LGH recently...

Read More

🇺🇸 USA Case Study: Emergency Hiperbaric Chamber Installation Within 1 Millimeter of Accuracy on the XYZ Plane

Emergency Hiperbaric Chamber Installation Within 1 Millimeter of Accuracy on the XYZ Plane   The Situation Recently, LGH customer Pennsylvania...

Read More

🇺🇸 USA Case Study: Vertically Lifting a Hydroelectric Turbine Rotor

First Time for Everything: Vertically Lifting a Hydroelectric Turbine Rotor   The Situation Our friends at TCB Industrial out of Modesto, CA,...

Read More

🇺🇸 USA Case Study: Creative Use of an Elevator Shaft to Transfer Chiller Components

Going down? How Retrofit Technology Used an Elevator Shaft to Lower Chiller Components into the Basement of an LA high-rise...

Read More

🇺🇸 USA Case Study: 536T Railroad Bridge Install with Hydra-Slide Skid System

536 Ton Railroad Bridge Install with the Hydra-Slide Skidding System   THE SITUATION L.G. Barcus & Sons are no strangers...

Read More

🇺🇸 USA Case Study: Massachusetts Bridge Replacement

CASE STUDY: INSTALLING TUB GIRDERS FOR BRIDGE REPLACEMENT   The Situation For Dave Blais at Atlantic Bridge and Engineering Inc.,...

Read More

🇺🇸 USA Case Study: Hotel Chiller Installation with Little Headroom

Hotel Chiller Installation with Little Headroom   THE SITUATION When it comes to chiller installation in a tight underground space,...

Read More

🇺🇸 USA Case Study: Lifting the Navy

The Complex Challenge of Lifting a Navy Vessel Ramp   THE SITUATION It’s a great day at work when you...

Read More